No Stupid Questions
No such thing. Ask away!
!nostupidquestions is a community dedicated to being helpful and answering each others' questions on various topics.
The rules for posting and commenting, besides the rules defined here for lemmy.world, are as follows:
Rules (interactive)
Rule 1- All posts must be legitimate questions. All post titles must include a question.
All posts must be legitimate questions, and all post titles must include a question. Questions that are joke or trolling questions, memes, song lyrics as title, etc. are not allowed here. See Rule 6 for all exceptions.
Rule 2- Your question subject cannot be illegal or NSFW material.
Your question subject cannot be illegal or NSFW material. You will be warned first, banned second.
Rule 3- Do not seek mental, medical and professional help here.
Do not seek mental, medical and professional help here. Breaking this rule will not get you or your post removed, but it will put you at risk, and possibly in danger.
Rule 4- No self promotion or upvote-farming of any kind.
That's it.
Rule 5- No baiting or sealioning or promoting an agenda.
Questions which, instead of being of an innocuous nature, are specifically intended (based on reports and in the opinion of our crack moderation team) to bait users into ideological wars on charged political topics will be removed and the authors warned - or banned - depending on severity.
Rule 6- Regarding META posts and joke questions.
Provided it is about the community itself, you may post non-question posts using the [META] tag on your post title.
On fridays, you are allowed to post meme and troll questions, on the condition that it's in text format only, and conforms with our other rules. These posts MUST include the [NSQ Friday] tag in their title.
If you post a serious question on friday and are looking only for legitimate answers, then please include the [Serious] tag on your post. Irrelevant replies will then be removed by moderators.
Rule 7- You can't intentionally annoy, mock, or harass other members.
If you intentionally annoy, mock, harass, or discriminate against any individual member, you will be removed.
Likewise, if you are a member, sympathiser or a resemblant of a movement that is known to largely hate, mock, discriminate against, and/or want to take lives of a group of people, and you were provably vocal about your hate, then you will be banned on sight.
Rule 8- All comments should try to stay relevant to their parent content.
Rule 9- Reposts from other platforms are not allowed.
Let everyone have their own content.
Rule 10- Majority of bots aren't allowed to participate here. This includes using AI responses and summaries.
Credits
Our breathtaking icon was bestowed upon us by @Cevilia!
The greatest banner of all time: by @TheOneWithTheHair!
view the rest of the comments
Point 1: SpaceX's entire development philosophy is "test early, test often and learn from failures". This is a much quicker pace than simulating every imaginable failure scenario and leads to faster progress in development. With the Falcon 9, that process proved wildly efficient and successful, culminating in a launch vehicle so reliable that it's cheaper to insure a payload on an F9 that already has multiple launches under its belt than a brand new booster. And they're turning enough of a profit to develop the Starship largely on internal funds, seeing how the early Raptor flight tests were before the HLS contract.
Point 2: Just adding, the Raptor engine is the first full-flow staged combustion engine to ever get off a testing stand and actually fly. The engineering complexity of these things is on the level of the Shuttle's RS-25.
Point 3: SpaceX were the only ones with more than designs and mockups to present, and they had a reliable track history from working with NASA on the commercial resupply and crew projects. And I see no problem with awarding a contract to a bid that actually fits into the budget.
Point 4: Multiple options was always part of the plan. NASA wants redundancy, so that if one of the providers runs into problems, the other provider can continue (and perhaps even take up the slack) instead of everything coming to a grinding halt. For a perfect example, look at the Shuttle and Commercial Crew programs. The Shuttle got grounded and since it was NASA's only manned launcher, they had to bum rides from the russians. In contrast, the CC contract was awarded to Boeing and SpaceX. With Starliner's continued issues, SpaceX has picked up the slack and fulfilled more than their initial contract in launches, instead of NASA having to bum rides from the russians again. The initial HLS contract was supposed to go to two providers, until the budget got cut. Blue's bid was always the favorite for the second pick.
This is a catchy statement, not an actionable philosophy. There's many ways to do it, and it's entirely possible that SpaceX is doing it poorly.
There's a lot of value in brainstorming every imaginable failure scenario. It's industry standard to do so in fact with HAZOPs. There's failures that you may not necessarily see in testing -- especially those that are rare but catastrophic. This is a field that should be acutely aware of that given past events.
There's also a right way to do testing and a wrong way to do testing. You typically consolidate tests and do several at a time, depending on the stage in the project. And you don't typically risk precious equipment in doing so.
From the sounds of it, they don't have a robust safety program, and they're hemorrhaging money and resources through poor testing philosophies.
There's a point at which you learn more from actually building something and putting it through its paces than simulating. It's a tough balance to strike , no argument there. Simulating until you've covered every conceivable edge case and failure mode is ludicrously costly and time consuming. Relying entirely on yeeting shit and seeing how it fails risks missing the edge cases. But so far, I've seen little reason to doubt that SpaceX has found a working balance between simulation and practical testing. They're certainly progressing faster than the industry historically has and the F9 has had no failures, even partial ones, in over 200 flights. That's a track record that most launch vehicles can't meet. It's definitely possible there's a 1/1000 flaw in the Falcon 9, but until it actually happens and they lose a rocket and/or a payload (gods willing it won't be crew), it's nothing but a hypothetical "but what if..." scenario.
The first time Starship was spoken of was in 2012, yes. The very first idealistic designs of it. The design that's actually being tested is from 2018. So 5 years to go from "Alright, this is what we're gonna do" to full stack flight testing. Roughly on pace with their previous rockets, the Falcon 1 and Falcon 9 took about 4 years.
Blue Origin had (and still has) no experience with human-rated capsules. Their proposed lander had to be assembled in lunar orbit or launched on another SLS. The Dynetics lander was over its own mass budget. It was literally too heavy to do the job it was being proposed for. Meanwhile, SpaceX proposed a derivative of what they were already working on. Blue and Dynetics had no practical development done on their landers, they would've relied on the HLS award to even get started on actual development.
SpaceX's bid was just under 3B. Blue Origin bid at a bit under 6B. Dynetics wanted 9B. This information is freely available online. SpaceX was also given the least in design development funding, with 135 million versus Blue's 579 million and Dynetics' 253 million. It's not terribly shocking that a company with a good track record and the lowest bid wins a contract.
They needed a lander contract. The entire Artemis project was already fucked when it comes to the timetable, but delaying the HLS contract would've made things even worse. And when the budget got cut, they negotiated with the one bidder who was deemed most likely to still get the job done with the lower budget, as opposed to the other two whose bids were wildly over what NASA could give them. SpaceX bid at 2.94 billion and the final award was 2.89 billion. Again, BO bid 6 billion and Dynetics bid 9 billion. Losing 50 million is an easier pill to swallow than getting half or a third of what you need.
SpaceX didn't need a mockup to present. They had prototypes of the base vehicle and a proposal for necessary modifications to perform the contract duties and an established track record of developing ambitious rocket engines and launch vehicles. BO had bits and pieces of other things they were gonna bolt together and a pretty model of how it'll look like, we swear, scout's honor. But if you're talking about the Blue Moon that eventually won the secondary bid, that's not what they initially proposed.Blue Moon Mk2 is a variant of a lander that's been in development since 2016, so two years longer than SpaceX's Starship prototypes. The one that's planned for a lunar landing this year, Blue Moon Mk1, isn't the one they bid for HLS. It's a robotic lander, smaller than the HLS's Mk2. So fancy that, they won a HLS contract when they bid a variant of something they were already working on, much like SpaceX did. And remember, BO is developing a lander. SpaceX is developing a fully reusable super heavy lift rocket, an interplanetary transport craft and a lunar lander as part of the same package.
Finish reading my post. SpaceX's initial bid was 2.94 billion and the final award was 2.89 billion. Again, they agreed that they can do the job for 50 million less than what they originally bid. BO's and Dynetics' proposals would've suffered a much larger hit. And sure, BO got the secondary contract for 3.4 billion, after rethinking their entire proposal. So why did they not submit that one in the first place? If they had, they might have gotten a similar call.
Blue Origin: "Here's renders and a papier-mâchė model of what our lander will look like. It's assembled together in lunar orbit, from an automated cargo ship, our own lander and another Orion." Note that this isn't what they won the option b proposal with.
SpaceX: "Here's renders of what our lander will look like. We have a full scale prototype out in Boca and we're blowing it up to see if our math and simulations are right on how much pressure the tanks can take. It'll require some modifications, such as larger landing legs and dedicated landing engines." And their HLS proposal isn't a vehicle carried in the Starship's cargo bay, it is the Starship.
I can find no source for SpaceX's initial bid being higher, let alone 2x higher (to meet your claim that they bid on the same level as BO, not even gonna consider Dynetics).If you have one, I'd like to see it. And if it is the case that SpaceX was picked because they were willing to slash their bid in half, then I would expect BO's follow-up litigation to be based around that. Instead, BO focused on the claim that NASA didn't give their proposal proper evaluation and consideration.
That wasn't my point. The point was that if their proposal had been closer to the budget set aside for the award, as opposed to being double the budget, they might have been contacted to see if they could complete the contract for the lesser amount.